Transparent pricing: $0.05 per square foot of plans you run. See what that costs on a real house

About

From forest to foundation

BidLoggers exists because the slowest part of selling a framing package has nothing to do with lumber. It's the day an estimator spends turning a builder's plan set into a priced list.

Every yard we've talked to has the same bottleneck. Plan sets arrive faster than anyone can quote them, so bids get declined for want of hours rather than want of interest. The estimators are good; there simply aren't enough of them, and the work is unglamorous enough that hiring more is hard.

What makes it tractable is that a framing takeoff is more checkable than it looks. A stud count is arithmetic against a wall length and a spacing. A header schedule reconciles opening by opening against a window schedule. If a machine does that work and shows the arithmetic, an estimator can verify in minutes what would take a day to reproduce.

That principle runs through the whole product. Quantities carry their derivation. Square footage — the thing you're billed on — records how it was calculated. Engagement numbers exclude your own team so they mean something. When we can't price a line honestly, it's flagged rather than blended into a total.

We're early and we'd rather say so than invent social proof. If you run a yard and this sounds like your problem, the useful next step is to put a plan set you have already bid in front of it and see how close it gets.